
Construction season is back in Bozeman, and in 2026, it will get underway a little earlier than usual.
The City of Bozeman has announced 14 infrastructure projects totaling $28,830,898 for the 2026 construction season. The work includes road resurfacing, utility upgrades, safety improvements, and new shared-use path segments across the city.
At a high level, this year’s projects focus on two things: improving existing infrastructure and adding capacity in areas where growth continues to put pressure on city systems. In other words, the detour signs are back.
This year’s construction work includes utility upgrades, road resurfacing, safety improvements, shared-use path additions, and a major new north side roadway connection.
On the utility side, the City is planning:
more than a mile of paving associated with utility work
Road work will include:
Work to increase traffic capacity will also include the connection of North 27th between Baxter and Cattail, with plans for a two-lane collector street, shared-use paths on both sides, a traffic signal at Baxter Lane, and a roundabout at Cattail Street.
The 2026 project list also includes safety and access improvements:
The City says funding for the 2026 construction season comes from a mix of grants, impact fees paid by development, and city assessments for improvement to existing infrastructure.
It is shaping up to be a busy construction season in Bozeman, which is probably the least surprising news we’ll hear all spring.
👉 Subscribe to our newsletter
👉 Follow us on Instagram or Facebook